Are there specific requirements for preparing the facility to set up the Arbin system?
Generally, there are several points to note: Arbin machines typically have a working ambient temperature range of 0°C to 30°C. Therefore, please prepare the air-conditioning system accordingly. The power grid system must be prepared to match the machine’s input power requirements. For example, some machines require single-phase power input, while […]
Can I set up the Arbin system myself for both hardware and software, or do I need Arbin’s assistance?
Arbin systems will be shipped with a computer that includes the full software kit pre-installed. The system hardware setup is simple: customers can easily set it up themselves by connecting the cycler to the computer and auxiliary devices using Ethernet cables. Figure 1: Example TCP/IP Connection to Arbin Main System […]
What payment methods are accepted when purchasing an Arbin machine?
Normal bank wire transfer is preferred. We avoid LC. Arbin’s standard payment mode is 40% – 40% – 20%. The first 40% is due right after the PO is received. Production starts only after Arbin’s bank account receives this payment. Lead time counts from this moment, not from PO receipt. […]
Conflict Clamp V” pop up when I start a test
This error occurs only when the Channel Based Voltage Clamp option is unchecked in ArbinAdvSys.cfg. This means all IV channels on the same IV channel board share one voltage clamp/voltage check. The MITS software must ensure all schedules on the same IV board channels share the same Voltage Clamp setting; […]
My test stopped due to an error called “Aux CAN Lost” or ”Aux ACK Failed”
This error means the Aux channel lost communication with IV channels. It usually occurs when the Batch/Mapping file was created or modified without downloading it to the cycler. Downloading the Batch/Mapping file resolves this issue: If this does not resolve the issue, check the cable connection from the Aux module […]
测试是否需要在温度室、安全室或手套箱中进行?
Installing a battery inside the chambers or glovebox is optional, Arbin can integrate it if customers need it for testing. Arbin offers an 8-zone temperature chamber for battery testing (MZTC) with an operating temperature of 10-60C and for cells rated up to 60A. Connections are made easy with the cables […]
How will the Device Under Test (cell, module, or pack) be connected to the Arbin system?
There are several way to connect to the DUT as follows: Individual cables Individual cell holders (coin cells, cylindrical cells, flat/pouch cells) Trays for holding multiple cells (coin cells, cylindrical cells, flat/pouch cells) Racks for organizing cells Chambers We will go to each method one by one as follows: 1. […]
My test stopped due to an error called “IR Inf”
The “IR Inf” error occurs when the system fails to obtain a valid result during an Internal Resistance (IR) measurement step. This typically happens when the measurement conditions are not sufficient to produce a reliable calculation, causing the system to return an infinite (invalid) resistance value and stop the test. […]
I have multiple climate chambers from different brands. Can I buy one MTCI unit and switch it between the chambers?
The answer is yes and no. Yes, if those chambers use the same communication protocol. For example, Votsch VT4002 and Weiss WT20/40 use the Votsch L4006 protocol. If you have these two chambers, you only need one MTCI unit. However, if you have another chamber like Espec SU-241 that uses […]
Can Arbin software generate a graph comparing data across cycles for one or multiple channels?
Yes. Arbin Data Watcher software (Version 2.2.217 and later) can do this. In Data Watcher software, click “Edit Chart Template”. From the Model dropdown, select “CycleCompare”. Return to the main window of Data Watcher. In the axis configuration, you can select the physical quantity for the X, Y1, and Y2 […]
What does “Step Control Error Check Unsafe” mean?
The “Step Control Error Check Unsafe” warning indicates that the system has detected a significant deviation between the expected (configured) output and the actual measured output during a test step. They are designed to detect open circuits or short circuits caused by loose IV cable connections, it also detects abnormal […]
充电/放电电流几乎为0或远远小于设定值?
In some cases, the charge or discharge current may be significantly lower than the configured value, or even close to zero. This issue is typically caused by software configuration limits or hardware-related problems. This article provides a structured troubleshooting guide to help identify and resolve the issue efficiently. Symptoms You […]
Solar & Storage Live Malaysia 2026: Advancing Battery Innovation for a Sustainable Energy Future
Event Overview Solar & Storage Live Malaysia 2026 is a premier event in Southeast Asia dedicated to solar energy and energy storage technologies. Taking place on April 8–9, 2026 at MITEC in Kuala Lumpur, the exhibition gathers industry leaders, engineers, and innovators across the global energy ecosystem. Organized by Terrapinn, […]
My test stopped due to an error called “Tokenbroken”
This error indicates too much data logged at a very short period of time. Check the schedule, make sure the data log setting is appropriate. Please open the schedule and locate the Log Limit: Then check the following points: Logging interval (time between data points)Many Arbin machines can acquire data […]
Why can’t I see the auxiliary value even though I have already mapped it?
In some cases, users may successfully configure (map) an auxiliary channel, but the corresponding auxiliary values do not appear during test execution. This issue is typically caused by missing schedule assignment or incomplete auxiliary channel configuration within the schedule. Possible Causes No schedule or an incorrect schedule is assigned to […]
Why does my schedule stop immediately after starting?
In some situations, a schedule may stop immediately after it starts. This behavior usually occurs when certain safety conditions are not met or when required devices are not properly connected. The system automatically stops the schedule to prevent unexpected behavior, hardware damage, or unsafe operating conditions. This article provides common […]
Arbin Participates in International Battery Seminar & Exhibit 2026 as Corporate Sponsor
Arbin Instruments recently participated in the International Battery Seminar and Exhibit 2026 in Orlando, Florida—one of the industry’s most established events focused on battery technology and energy storage innovation. As a proud Corporate-level sponsor, Arbin was honored to support this premier gathering of researchers, engineers, and industry leaders from across […]
Arbin Showcases Advanced Battery Testing Solutions at The Battery Show Asia 2026 in Hong Kong
Arbin Instruments proudly participated in The Battery Show Asia 2026, one of the region’s most influential exhibitions for advanced battery technology, energy storage, and electric mobility. The event was held at AsiaWorld‑Expo in Hong Kong, bringing together leading companies, engineers, and innovators from across the global battery ecosystem. As both […]
Arbin to Showcase Advanced Battery Testing Solutions at InterBattery 2026 in Seoul
Arbin Instruments is pleased to announce its participation in InterBattery 2026, one of the world’s leading exhibitions dedicated to battery technology and energy storage innovation. The event takes place March 11–13, 2026, at COEX Convention & Exhibition Center in Seoul, South Korea. As Korea’s largest international battery exhibition, InterBattery brings […]
Application Examples of User-Defined MetaVariables (MV_UD)
In Arbin software, MV_UD (short for User-Defined Meta Variables) is a powerful tool for controlling battery testers. This article explains how to use MV_UD in Arbin MITS software. Storing Values in MV_UD with SetValue(s) In the Control Type list, select SetValue(s). SetValue(s) assigns a fixed value of a physical quantity […]