Measure Battery's Actual Capacity and Coulombic Efficiency (CE) using Arbin

Benefit of Battery’s Capacity and CE measurement

Battery capacity and Coulombic Efficiency are critical indicators of a battery's characteristics and suitability for various applications: 

Researchers use these metrics to evaluate material properties and understand their impact on battery performance.

Battery manufacturers rely on these measurements to screen and grade batteries, ensuring that only units meeting quality standards are approved for use.

Battery users can assess the State of Health (SOH) of their batteries, enabling accurate predictions of battery life and performance.

Battery integrators can grade and match batteries with similar capacities, optimizing overall product performance and extending service life.

可选模块: Method

A common method for measuring a battery’s performance involves cycling the battery between its empty and full states. During each cycle, the battery’s actual capacity is determined by calculating the total discharged capacity, while the coulombic efficiency (CE) is calculated by dividing the discharge capacity by the charge capacity.

Charge/Discharge Capacity: This is calculated using the formula:

Charge/Discharge Capacity = ∫  𝑖(𝑡)𝑑𝑡

Coulombic Efficiency: CE is determined as:

Coulombic Efficiency = Discharge Capacity / Charge Capacity

material-symbols_battery-status-good

To achieve stable and repeatable results, it is recommended to use a consistent charge/discharge pattern across all cycles.

Conduct CE test on Arbin

Arbin equipment facilitates accurate CE testing by automatically calculating real-time capacity (with 100 microseconds time resolution) through high-precision voltage and current measurements during battery tests. This automated approach makes measuring coulombic efficiency straightforward and reliable, ensuring precise evaluation of battery performance.

A typical CE test procedure can be listed below:

Step 1: Initial Rest

Step 2: Charge battery to full (SOC=100%)

Step 3: Rest for battery reaching electrochemical balance

Step 4: Discharge Battery to empty (SOC=0%)

Step 5: Rest for battery reaching electrochemical balance

Step 6: Loop back to Step 2

Implement this procedure to Arbin schedule file: 

ARBIN-Implement this procedure to Arbin schedule file

Then add criteria for charge/discharge cutoff, loop times and data log:

ARBIN-Then add criteria for charge:discharge cutoff, loop times and data log

You are all set!
Let Arbin system takes care of everything then

ARBIN-You are all set-i1

Real-time voltage/current display

Zoom in for detailed curve

ARBIN-You are all set-i2

Real Time Capacity Display

Complete Test Data Summary

Test Statistics by Cycle

Auto Calculate Capacity and Coulombic efficiency per cycle

ARBIN-Test Statistics by Cycle

Test Statistics by Step

ARBIN-Test Statistics by Step

Detailed Test Data

ARBIN-Detailed Test Data